docs: update meta files for E2E test fixes

Update test counts (82 E2E passing), add CHANGELOG entries for
27 fixed failures and AgentPane template fix, update TODO.md.
This commit is contained in:
Hibryda 2026-03-12 03:50:13 +01:00 committed by DexterFromLab
parent 1f293083b2
commit c8df61199f
3 changed files with 6 additions and 2 deletions

View file

@ -5,7 +5,7 @@
- v1 is a single-file Python app (`bterminal.py`). Changes are localized.
- v2 docs are in `docs/`. Architecture decisions are in `docs/task_plan.md`.
- v2 Phases 1-7 + multi-machine (A-D) + profiles/skills complete. Extras: SSH, ctx, themes, detached mode, auto-updater, shiki, copy/paste, session resume, drag-resize, session groups, Deno sidecar, Claude profiles, skill discovery.
- v3 Mission Control (All Phases 1-10 Complete + S-1 Phase 1/1.5/2/3 + S-2 Session Anchors + Provider Adapter Pattern + Provider Runners + Memora Adapter + SOLID Phase 3 + Multi-Agent Orchestration): project groups, workspace store, 15 Workspace components, session continuity, workspace teardown, file overlap conflict detection, inotify-based external write detection, multi-provider adapter pattern (3 phases + Codex/Ollama runners), worktree isolation, session anchors, Memora adapter (read-only SQLite), SOLID refactoring (agent-dispatcher split → 4 utils, session.rs split → 7 sub-modules, branded types), multi-agent orchestration (btmsg inter-agent messaging, bttask kanban task board, agent prompt generator, BTMSG_AGENT_ID env passthrough, periodic re-injection, role-specific tabs: Manager=Tasks, Architect=Arch, Tester=Selenium+Tests, Reviewer=Tasks), dead v2 component cleanup, dashboard metrics panel (MetricsPanel.svelte — live health + task counts + SVG sparkline history), auto-wake Manager scheduler (3 strategies: persistent/on-demand/smart, 6 signal types, configurable threshold), reviewer agent role (workflow prompt, #review-queue/#review-log auto-channels, reviewQueueDepth attention scoring 10pts/task cap 50, Tasks tab). 388 vitest + 68 cargo tests + 22 Phase A E2E + 6 Phase B E2E (multi-project + LLM-judged).
- v3 Mission Control (All Phases 1-10 Complete + S-1 Phase 1/1.5/2/3 + S-2 Session Anchors + Provider Adapter Pattern + Provider Runners + Memora Adapter + SOLID Phase 3 + Multi-Agent Orchestration): project groups, workspace store, 15 Workspace components, session continuity, workspace teardown, file overlap conflict detection, inotify-based external write detection, multi-provider adapter pattern (3 phases + Codex/Ollama runners), worktree isolation, session anchors, Memora adapter (read-only SQLite), SOLID refactoring (agent-dispatcher split → 4 utils, session.rs split → 7 sub-modules, branded types), multi-agent orchestration (btmsg inter-agent messaging, bttask kanban task board, agent prompt generator, BTMSG_AGENT_ID env passthrough, periodic re-injection, role-specific tabs: Manager=Tasks, Architect=Arch, Tester=Selenium+Tests, Reviewer=Tasks), dead v2 component cleanup, dashboard metrics panel (MetricsPanel.svelte — live health + task counts + SVG sparkline history), auto-wake Manager scheduler (3 strategies: persistent/on-demand/smart, 6 signal types, configurable threshold), reviewer agent role (workflow prompt, #review-queue/#review-log auto-channels, reviewQueueDepth attention scoring 10pts/task cap 50, Tasks tab). 388 vitest + 68 cargo + 82 E2E (smoke + Phase A + Phase B LLM-judged).
- v3 docs: `docs/v3-task_plan.md`, `docs/v3-findings.md`, `docs/v3-progress.md`.
- Consult Memora (tag: `bterminal`) before making architectural changes.