docs: mark Phase 1 scaffolding as complete
This commit is contained in:
parent
758d626fab
commit
89a98adb61
1 changed files with 7 additions and 7 deletions
|
|
@ -4,14 +4,14 @@ See [task_plan.md](task_plan.md) for architecture decisions, error handling, and
|
|||
|
||||
---
|
||||
|
||||
## Phase 1: Project Scaffolding [status: not_started] — MVP
|
||||
## Phase 1: Project Scaffolding [status: complete] — MVP
|
||||
|
||||
- [ ] Create feature branch `v2-mission-control`
|
||||
- [ ] Initialize Tauri 2.x project with Svelte 5 frontend
|
||||
- [ ] Project structure (see below)
|
||||
- [ ] Basic Tauri window with Catppuccin Mocha CSS variables
|
||||
- [ ] Verify Tauri builds and launches on target system
|
||||
- [ ] Set up dev scripts (dev, build, lint)
|
||||
- [x] Create feature branch `v2-mission-control`
|
||||
- [x] Initialize Tauri 2.x project with Svelte 5 frontend
|
||||
- [x] Project structure (see below)
|
||||
- [x] Basic Tauri window with Catppuccin Mocha CSS variables
|
||||
- [x] Verify Tauri builds and launches on target system
|
||||
- [x] Set up dev scripts (dev, build, lint)
|
||||
|
||||
### File Structure
|
||||
```
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue