Tauri + Svelte 5 + Rust application for orchestrating multiple AI coding agents. Includes Claude, Aider, Codex, and Ollama provider support, multi-agent communication (btmsg/bttask), session anchors, plugin sandbox, FTS5 search, Landlock sandboxing, and 507 vitest + 110 cargo tests.
32 lines
1.1 KiB
Markdown
32 lines
1.1 KiB
Markdown
# Testing Gate (Post-Implementation)
|
|
|
|
Run the full test suite after every major change before considering work complete.
|
|
|
|
## What Counts as a Major Change
|
|
|
|
- New feature or component
|
|
- Refactoring that touches 3+ files
|
|
- Store, adapter, or bridge modifications
|
|
- Rust backend changes (commands, SQLite, sidecar)
|
|
- Build or CI configuration changes
|
|
|
|
## Required Command
|
|
|
|
```bash
|
|
cd v2 && npm run test:all
|
|
```
|
|
|
|
This runs vitest (frontend) + cargo test (backend). For changes touching E2E-relevant UI or interaction flows, also run:
|
|
|
|
```bash
|
|
cd v2 && npm run test:all:e2e
|
|
```
|
|
|
|
## Rules
|
|
|
|
- Do NOT skip tests to save time. A broken test suite is a blocking issue.
|
|
- If tests fail, fix them before moving on. Do not defer test fixes to a follow-up.
|
|
- If a change breaks existing tests, that's signal — investigate whether the change or the test is wrong.
|
|
- When adding new logic, add tests in the same commit (TDD preferred, see rule 06).
|
|
- After fixing test failures, re-run the full suite to confirm no cascading breakage.
|
|
- Report test results to the user: pass count, fail count, skip count.
|