BTerminal/docs/v3-progress.md
Hibryda 03e9f34e07 docs(v3): add Mission Control redesign planning docs
v3 architecture planning: task plan with core concept, user requirements,
and architecture questions for adversarial review. Findings doc with
codebase reuse analysis (keep/replace/drop). Progress log for v3 sessions.
2026-03-07 15:22:55 +01:00

293 B

BTerminal v3 — Progress Log

Session: 2026-03-07 — Architecture Planning

Phase: Adversarial Design Review

  • Launch architecture agents (advocate, devil's advocate, synthesizer)
  • Collect findings
  • Produce final architecture plan
  • Create implementation phases